Vehicle Rate Card File: Difference between revisions

From NEOSYS User Support Wiki
Jump to navigationJump to search
mNo edit summary
Line 23: Line 23:
== Specifying a minimum amount in the rate card ==
== Specifying a minimum amount in the rate card ==


The 'greater than' sign is required after the percentage and before the minimum amount with no spaces eg 20%>2000 means loading of 20% with a minimum of 2000.
This is a method of achieving a special rate of '15% extra charge for full colour (minimum extra charge Dhs 3,000)'.


In the image you can see in the loading section (where the arrow points) an example of how you document a minimum amount in the rate card which on the actual rate card was mentioned as '15% extra charge for full colour (minimum Dhs 3,000)'.
If the % amount on the gross is less than the minimum then add the % amount onto the gross. Otherwise add a flat minimum amount.
 
The 'greater than' sign is required after the percentage and before the minimum amount with no spaces E.g 20%>2000 means loading of 20% with a minimum of 2000.
 
In the image below you can see an example of this, in the loading section (where the arrow points) of how to charge a minimum amount if the additional % amount is less than the minimum.
 
E.g Rate = 20%>2000, Gross1 = 11,000 & Gross2 = 5000.
 
20% on Gross1 = 2200. Which is greater than 2000. So + 20% onto Gross1 = 13200.
20% on Gross2 = 1000. Which is less than 2000. So + minimum onto Gross2 = 6000.  


[[image:ratecard.jpg]]
[[image:ratecard.jpg]]


== Standard rates ==
== Standard rates ==

Revision as of 08:06, 22 July 2018

Ratecardfile.jpg

Entering Vehicle Rate Cards into NEOSYS

Standard pricing and costing information can be entered into the Ratecard File in NEOSYS where it can easily be accessed while creating media plans and schedules.

Click the Lookup button for the Specification field of a vehicle and choose Rate Card from option and follow the options to choose specific ratecard.

Be aware that if #Tags are entered if specification field, the option to choose a Rate Card will not be available. To choose a ratecard, cut tags out Ctrl + X, choose new rate card, paste tags back in to specification field with Ctrl + V.

Rates can either be gross rates for individual ads or the rate can be per column centimeter or per second etc. When the rate is dependent on size or duration, the final cost per ad is calculated depending on the size/duration entered in the schedule. "Sized" rates are indicated by an asterisk "*" character without the quotes either within or at the end of the specification column. eg INS PG* would be converted to INS PG*20X4 on the schedule. You can also enter the main or fixed sizes of a publication directly into the ratecard like INS PG*20X4.

NEOSYS allows the precise ratecard information to be fed into the system which can very easily be retrieved when preparing the schedule. There is a separate column for loadings like color or position loading where the loading charges can be specified. Client specific rates section allows users to enter discount, commission and other rates for specific clients. This field can also be used to define specific discounts, commissions and other rates for all clients if the client code field is left blank on the first line.

Ratecard2.jpg


Below screenshot shows which part of the schedule picks up the Commission, Agency fee, Agent fee/Discount, Tax, Other fee fields of the vehicle ratecard file:


Schedule rate card.jpg

Specifying a minimum amount in the rate card

This is a method of achieving a special rate of '15% extra charge for full colour (minimum extra charge Dhs 3,000)'.

If the % amount on the gross is less than the minimum then add the % amount onto the gross. Otherwise add a flat minimum amount.

The 'greater than' sign is required after the percentage and before the minimum amount with no spaces E.g 20%>2000 means loading of 20% with a minimum of 2000.

In the image below you can see an example of this, in the loading section (where the arrow points) of how to charge a minimum amount if the additional % amount is less than the minimum.

E.g Rate = 20%>2000, Gross1 = 11,000 & Gross2 = 5000.

20% on Gross1 = 2200. Which is greater than 2000. So + 20% onto Gross1 = 13200. 20% on Gross2 = 1000. Which is less than 2000. So + minimum onto Gross2 = 6000.

Ratecard.jpg

Standard rates

The standard rates is a table for standard discounts and their corresponding discount values. These standard discounts appear in the "Discount%" field under "Client Specific Rates" as shown in the screenshot below.

Below screenshot shows the rate card file for the vehicle Copenhagen Connoisseur (COCO). Under Client Specific Rates "SILVER MEMBER" is chosen as the discount for brand "M.N.A.S and Sons" of client "Zenith Media" (ZEME). So in a media schedule for brand MNAS, if the vehicle Copenhagen Connoisseur is used, the discount shown will be -10% since SILVER MEMBER corresponds to -10% in the standard rates table.

Standard discounts.jpg

CS discount.jpg

How to specify discount rates for bill and cost line per Specification

If users want to specify discount rates for vehicle bill and cost line in schedule per Specification entered in the ratecard, then enter the columns highlighted in the screenshot below in the Rate table section of the vehicle ratecard file. The specification pop-up in the schedule file will show users the bill and cost discount rates which can reduce mistakes during schedule creation. As of 20/3/2017 the discount rates entered in the Rate table are not automatically picked up in schedules but NEOSYS will review this feature on a future date and automate the rates to appear in schedules.

Discount rates that are a percentage of Gross amount must be put under the column headings BILLDISC% and COSTDISC%. Discount rates that are a fixed numeric amount must be put under the column heading BILLDISC and COSTDISC. Refer to below screenshot:

Bcd.jpg

The Specification search on schedules will look as below screenshot:

Specification row selection pop-up options in the schedule

Bcd2.jpg

Specification column selection pop-up options in the schedule

Bcd3.jpg